IGB-ADR-001 — Communication Architecture¶
ADR Identifier¶
IGB-ADR-001
Title¶
Communication Architecture
Status¶
Accepted
Evidence State¶
Canonicalized from the legacy ADR-001-Communication.md.
This ADR preserves only engineering decision content supported by the currently verified repository evidence.
Context¶
Not Established.
No verified repository evidence currently establishes the original engineering context for this decision.
Problem Statement¶
Not Established.
No verified repository evidence currently establishes the original problem statement.
Alternatives Considered¶
Not Established.
No verified repository evidence currently identifies the alternatives considered during the original decision.
Decision¶
The communication architecture adopts:
- Mesh First
- Satellite Backup
- Emergency SOS Override
These decisions are directly supported by the legacy ADR-001 record.
Decision Rationale¶
Not Established.
The rationale for selecting the above communication strategy is not established by the currently verified repository evidence.
Consequences¶
Not Established.
The expected technical, operational, and lifecycle consequences are not established by the currently verified repository evidence.
Related Specifications¶
Not Established.
IGB-COM-001_Communication_Architecture.md exists in the repository,
but the file is currently empty and contains no verified specification
content.
Related Verification Assets¶
Not Established.
No verified verification asset has been identified for this ADR.
Approval Information¶
Not Established.
The legacy ADR records the status as Accepted, but no separate
approval authority or approval record has been identified in the
currently verified evidence.
Traceability¶
Direct Evidence¶
- Legacy ADR:
docs/architecture/Architecture-Decision-Records/ADR-001-Communication.md
Related Architectural Record¶
IGB-COM-001_Communication_Architecture.md- Repository file exists.
- Current content: empty.
- No historical decision content identified.
Related ADR¶
IGB-ADR-002- GPIO-25 is independently recorded as Emergency SOS.
- This relationship does not establish the implementation mechanism of the Emergency SOS Override decision in this ADR.
Revision History¶
| Revision | Description | Evidence |
|---|---|---|
| Rev.1 | Canonicalization of legacy ADR-001 | Legacy ADR-001 and repository Git history |
Governance¶
This ADR is governed by:
- Engineering Constitution Rev.1
- Chapter 28 — Architecture Decision Record (ADR) Governance
- Approved Engineering Governance System
- Engineering Baselines
- Configuration Management Procedures
This ADR records engineering decisions and does not establish or modify governance authority.